After spending another several frustrating hours this morning re-sealing the light frame I eventually managed to get down to the resin room. The first layer went on pretty smoothly, will have a better idea on Monday as to whether or not stress cracks are going to appear or if it will shrink too much. The first layer was set at about 3 mm, this took approx 2.5 litres of resin, luckily I've been allocated a 20 kg barrel of the stuff, bad news is i'll probably have to pay for it after this, we shall see.
Friday, 22 January 2010
Subscribe to:
Post Comments (Atom)

0 comments:
Post a Comment